Posts Tagged by Brew Rig

Gene-Wilder-Its-Alive

The Doghouse Brew Rig Build Part Five “How It Works” (Update 8-5-2013)

In the fifth and final installment in the brew rig series I’m going to talk a little about how all the systems work together to produce that wonderful libation we refer to as BEER. In earlier posts we discussed the frame, the gas system, the electrical system, and finally the plumbing. I have to admit […]

2012-02-12_14-37-01_515

The Doghouse Brew Rig Build Part Four – “The Plumbing”

In part Four of The Doghouse Brew Rig Build series I’m going to discuss the plumbing system. I’m sure this does not need to be pointed out but basically your plumbing system moves your strike water and wort from one vessel to the other. This system is what keeps you from having to lift up […]

Diagram of control panel layout

The Doghouse Brew Rig Build – Part Three “The Control Panel” (Updated 2014-03-16))

In part three of The Doghouse Brew Rig Build I’m going to discuss the components of the control box. The control box is what automates your system. The components of the box send signals back and forth to your furnace valves (described in Part Two), which in turn open and close to fire the burners. […]

Gas Components

The Doghouse Brew Rig Build – Part Two “The Gas System”

Ok, in part 2 of The Doghouse Brew Rig Build we are going to discuss the different components of the gas system and how it all goes together. The first thing you should know is ALWAYS BE SAFE! Putting the gas system together is not difficult but if you are not completely comfortable tinkering with […]

2012-02-12_14-37-51_579

The “Doghouse” Brew Rig Build – Part One

So it’s been a while since I’ve had a chance to spew a little madness. I have been busy building what my wife affectionately dubbed the “ Doghouse”. What is the Doghouse you ask? Well…it’s a single tier brew stand based loosely on the Brutus 10 and like the Brutus it is a fully automated […]

Related Posts Plugin for WordPress, Blogger...